| Pilot deployment package |
Available for controlled operator environments |
Containerized service, documented installation path, access-control model, and support boundaries are provided during pilot onboarding. |
Available |
| Engineering test evidence |
Available for diligence review |
Relevant test outputs, release notes, and reproducibility guidance are shared with pilot teams during technical review. |
Available |
| Policy-bound routing decisions |
Available for pilot evaluation |
Sanctions, jurisdiction, and operator policy constraints are evaluated before a decision is committed. |
Available |
| Replayable audit trail |
Available for pilot evaluation |
Each decision can be tied to policy version, input digest, signer set, and outcome so an examiner can reconstruct why a decision cleared or failed. |
Available |
| Post-quantum signing posture |
Planned and staged |
Daily roll-up signing and post-quantum verification are part of the hardening roadmap; current pilots receive a documented transition path. |
In progress |
| SOC 2 Type II |
In progress |
Control mapping and evidence collection are underway; current pilot agreements should treat this as not yet certified. |
In progress |
| FIPS 140-3 CMVP certification |
Not yet certified |
Certification is a forward-looking requirement. Pilot diligence can include a gap posture and planned certification pathway. |
Gap posture |
| MiCA CASP regulatory sandbox enrolment |
Operator- and jurisdiction-dependent |
Pilot scoping includes jurisdiction review and regulator-facing evidence where appropriate. |
Pilot-scoped |
| Empirical performance and decision-quality anchors |
Pilot-measured |
Performance, false-positive/negative behaviour, and override patterns are measured in the operator’s environment before expansion. |
Pilot-measured |
| High-availability production posture |
Roadmap / deployment-dependent |
Pilot architecture is scoped to agreed availability needs; multi-region or active-active production posture is part of deployment planning. |
Roadmap |